PMO News Portal - The construction of this tower with a
height of 43.5 meters and a reinforced concrete wall with a thickness of 35
centimeters has been completed using a sliding formwork method in a period of
14 days.
This tower has a different structure with several openings
and is unique in its kind in Imam Khomeini port. In the mechanized grain
terminal, the tower works to deliver grain from the transmission and
distribution system between the hives.
with the completion of this 150,000-ton terminal, the annual
capacity of unloading and loading grain in the Imam Khomeini port complex will
increase by 600,000 tons.