flag

Chabahar fully mechanized silo will be operationalized next year

Chabahar fully mechanized silo will be operationalized next year
The largest fully mechanized grain silo in the southeast of the country, equipped with an unloading system and two transfer lines from the docks with a capacity of 1,200 tons per hour, will be operationalized next year.

PMO News Portal – the construction of the 100,000 ton silo of Shahid Beheshti port of Chabahar with a dynamic capacity of 600,000 tons per year started in November 2020, will be operationalized in 2022.

The largest fully mechanized grain silo in the southeast of the country, equipped with an unloading system and two transfer lines from the docks with a capacity of 1,200 tons per hour, was designed and will be operationalized next year.

The 100,000-ton grain silo of Shahid Beheshti port of Chabahar was implemented with the aim of accelerating the unloading and increasing the storage capacity of basic commodities; This project, as one of the economic factors of the country's port, will have a great impact on reducing the costs of transportation and storage of goods.

Tuesday Aug 10, 2021
08:34
Rate is required
Characters left: 500
Comment is required